Posts Tagged ‘dc’

Study: Just Six Tracks Carry 30% of People Across the Potomac (57 Highway Bridge Lanes Carry the Rest)

July 29th, 2015 2 comments

A new Virginia study (PDF) finds that Metro and other transit operators carry a major portion of all cross-Potomac travel in a just a few crossings, using far less space than the 57 highway bridge lanes that carry the rest. If built, an expanded bridge crossing will need transit to maximize its ability to move people across the river.

PotomacRiverStudy Map

Transit’s Role is Critical

While some media outlets focused on the study’s highway expansion recommendation, the presentation acknowledged that Metro, VRE, and other bus operators plays a major role in the movement of people across the river from Virginia to DC in the core of the region. Seeing that, we thought we we’d drill down further to estimate how many people are actually crossing the river, using which bridge, and by what mode. Supplementing the study with available transit ridership data and vehicle occupancy data (PDF), we arrived at the following estimates: Read more…

BRT comes to DC via Hollywood

June 4th, 2014 1 comment

Video still showing Cleveland's center-running BRT, from the filming of Captain America, Winter Soldier.

Video still showing Cleveland’s center-running BRT, from the filming of Captain America, Winter Soldier.  Click image for original video.

I recently watched “Captain America:  The Winter Soldier” with some friends recently at the theater near Gallery Pl-Chinatown.  I had heard rumors that the film was set in DC, which was a selling point since it’s always fun hearing names of local streets or venues and picking out inconsistencies between Hollywood’s portrayal and the real thing.  Our friends over at Greater Greater Washington already noted that this film replaces parts of Rosslyn and Roosevelt Island with a massive S.H.I.E.L.D. headquarters complex.

But little did I know that the film would take me to Cleveland.  Read more…

Categories: Transit Travelogue Tags: , , ,

What Metro 2025 Means for the District of Columbia

March 13th, 2014 Comments off

Metro 2025 would bring significant benefits to the District of Columbia, allowing the city to thrive economically while preserving neighborhoods and downtown vitality.

Metro’s Momentum plan calls for seven Metro 2025 initiatives – from eight-car trains to bus-only lanes, which will bring dramatic improvements to the quality of life and transportation in the District.

 

Benefits Icons_Expansion

Supports D.C. Transit Projects

The District has committed to a 50% market share for public transportation, and is building a Streetcar and expanded Circulator network that will depend on robust Metrorail and Metrobus services. Metro concurs that the Streetcar and Circulator are worthwhile ventures, but they will always rely on the supporting regional “backbone” of Metrorail and Metrobus in order to deliver their intended results.  Consider that every single planned D.C. Streetcar line in the 22-mile system begins, ends, or connects with a Metrorail station, and the importance of sufficient capacity on Metrorail becomes quite clear.

Today, more than 100,000 people a month transfer between Metro and the Circulator.  By 2040, even the first few lines of the D.C. Streetcar (those funded in the CLRP, not even counting the full 22-mile system) are projected to generate thousands of additional transfers to Metrorail and Metrobus each day.

DC-CLRP-Projects

D.C. Streetcar projects funded in the CLRP. The planned 22-mile system would construct even more lines.

By ensuring that Metro services can keep pace with congestion and demand, Metro 2025 is critical to making D.C.’s transit projects a success, and critical to helping D.C. reach it’s transportation goals.

 

Benefits Icons_Support Growth

Supports D.C.’s Growing Population and Economy

The District of Columbia’s population is surging, and its economic and population growth is only projected to grow. With that growth comes significant transportation needs, and Metro 2025 is critical to Metro’s success in meeting that growth.

To handle this growth, D.C. needs the rail and bus system that Metro 2025 would deliver: 8-car trains capable of moving the equivalent of 16-18 lanes of highways into the District, superior bus service, and more. For example, Metrobus is helping the 16th Street NW corridor to grow – ridership has surged by over 5,000 trips per day, and today buses are 3% of the vehicles but move 50% of the people on that road. Read more…