A recent Metro study determined that a Rosslyn bypass is infeasible but a second Metrorail station in Rosslyn to restore frequent peak period Blue Line service is possible.
In a post last year describing the strategies in Metro 2025, we described some options for new Blue Line connections. The first was a Rosslyn bypass that would allow some Blue Line trains to connect directly to the Orange Line at Court House. The second was a second Rosslyn station that would connect to the current Rosslyn station via an underground walkway. Both of these options, illustrated in the graphics below, would allow increased frequencies on the Blue Line during peak periods.
Metro recently completed a study that evaluated these two options (pdf). The bad news is that the Rosslyn bypass (interline connection) was deemed infeasible. This is due to the location of building foundations and the turning radius required by the track.
However, the second Rosslyn station was deemed feasible, as illustrated in the map below.
Location for a proposed second Rosslyn Station, including three potential options for a pedestrian walkway.
This new Metrorail station would connect to the current Rosslyn station via one underground walkway.
Metro Office of Planning is submitting the second Rosslyn station for project development funding.
Last fall we let you know about changes we proposed on the bus routes serving Hunting Point and the Mount Vernon Avenue/Jefferson Davis Highway corridor. We developed the original proposal based on recommendations that emerged from a comprehensive study conducted on Routes 10A, 10B, and 10E in 2013. In the weeks leading up to our September public hearings as well as in oral and written testimony given at those hearings we received numerous comments and opinions on the options we presented. We incorporated that feedback into an adjusted proposal and presented it to Metro’s Board of Directors for approval.
On Sunday, March 30, 2014, Metro will implement these changes that will impact Metrobus routes 9E, 10A, and 10E. We believe riders will benefit from faster travel times and improved connections between Alexandria, Crystal City and Rosslyn.
What these changes mean for you:
Route 10A riders:
During the a.m. peak period northbound (from Hunting Point) and the p.m. peak period southbound (to Hunting Point), Route 10R will replace 10A service. Route 10R will provide a direct connection between Crystal City and Rosslyn bypassing the Pentagon. Existing 10A passengers traveling to the Pentagon may take a Route 10E bus or transfer to Metrorail at Braddock Road Station. These changes do not impact off-peak, weekend, a.m. peak period southbound (from the Pentagon) or p.m. peak period northbound (to the Pentagon) 10A service. Read more…
Categories: Service Changes Tags: 10A, 10E, 10R, 10S, Braddock Road, ccpy, Crystal City, Metrobus, Pentagon, Pentagon City, Rosslyn, service
Recent Comments